This winter our dredger ‘Beaver’ had a massive facelift. Not only was the cabin and wheelhouse completely renewed, but the engine was fully overhauled and new electrics and lighting were installed throughout.

She is now hard at work dredging row A and will then be going on to rows D and E, before finishing with H. We anticipate it all to be finished by Easter (weather permitting).

The post Our dredger ‘Beaver’ has a facelift appeared first on Burnham Yacht Harbour.